Week 1 (Feb 19 - Feb 25): Planning & Designβ
- Finalize detailed user stories and technical specifications.
- Create wireframes and prototypes for key user interfaces.
- Define API architecture and database schema.
- Define Color Palette.
- Set up project repositories, CI/CD pipelines, and development environments.
Week 2 (Feb 26 - Mar 3): Database & Authenticationβ
- Implement the Postgres database schema, including tables for users, profiles, content, subscriptions.
- Develop API endpoints for user registration, login, and authentication.
- Integrate OAuth for third-party authentication (Google, Apple, etc.).
- Set up role-based access control (RBAC) for fans and artists.
Week 3 (Mar 4 - Mar 10): Profile Management & Authentication Testingβ
-
Web Track (Artists):
- Develop artist profile management features.
- Customizing profiles
- Uploading content
- Setting subscription pricing
- Implement frontend UI for authentication and profiles using Next.js
- Conduct initial security testing on authentication flows.
- Develop artist profile management features.
-
Web Track (Fans)
- Personal information maintenance
- Subscription preferences
- Viewing exclusive content
-
DB Track
- Do some db stuff
- other db stuff
Week 4 (Mar 11 - Mar 17): Content Sharing & Subscription Managementβ
- Develop API endpoints and frontend components for content uploads.
- Implement content access controls based on subscription status.
- Integrate Stripe or PayPal for subscription payments.
- Allow artists to define and manage subscription tiers.
Week 5 (Mar 18 - Mar 24): Fan-Artist Interactions & Payment Systemβ
- Implement UI for viewing / listening to content that fans are subscribed to
- Potentially implement playlist creation
- May not be super important, since fans probably wonβt be subscribed to a whole bunch of artists
- Finalize payment processing and integrate it with the database.
- Test the subscription and payment flow end-to-end.
Week 6 (Mar 25 - Mar 31): Frontend Enhancements & Initial Testingβ
- Polish frontend UI and improve UX for key features.
- Conduct initial integration testing between frontend and backend.
- Optimize API responses and database queries for performance.
- Begin internal alpha testing with a small group of testers.
Week 7 (Apr 1 - Apr 7): Beta Testing & Security Complianceβ
- Conduct beta testing with selected artists and fans.
- Implement security measures for data protection and compliance (GDPR, CCPA).
- Fix critical bugs and enhance system performance based on tester feedback.
- Finalize documentation for launch and support.
Week 8 (Apr 8 - Apr 15): Final Adjustments & MVP Deploymentβ
- Address remaining issues and performance optimizations.
- Deploy the MVP to the production environment.
- Monitor system performance and user interactions.
- Collect initial user feedback and plan for future iterations.
Post-MVP Plan:
- Evaluate feature adoption and prioritize post-launch updates.
- Gather continuous feedback to enhance the platform based on user demand.
- Plan for scaling infrastructure as user base grows.